Repanelling work has been undertaken on Blackpool PD3 No.529 recently in preparation for the summer season ahead and specific panels will be repainted.
Blackpool AEC Swift 570 has received a 75-point safety inspection prior to MoT work whilst the removed road springs have been sent away for Ribble 1805 and from these new ones are to be made at a cost of £600 each.